SMART CITY EXPO 2021

  Jaime Ezquerra Martínez from FCC Medio Ambiente represented LIFE 4FILM at Smartcity Expo. He spoke of the importance of preventing waste from going to landfill or incineration, explaining that this project will treat 10,000 tons / year valuing...

METALLIC STRUCTURE

Completion of the metal structure for the water treatment equipment required for stage 2 of the project, the washing stage. The structure has a length of 23.5 metres and a width of 5.5 metres, distributed over two floors, with a total height of 7.8 metres. This...

LIFE 4FILM ON SPANISH RADIOTELEVISION

Spanish Radiotelevision visited the facilities of La Ecocentral on November 12, in order to show how waste is managed once it reaches a plant to be treated. In this interview, the three LIFE projects that are currently being developed in the Ecopark, and whose main...